For this podcast episode, we have a special guest, Guido Dalessi, CEO of Elestor. Listen as we delve into their unique Hydrogen-Bromine flow batteries, discuss LDES in the Europe, how to secure right partnerships, and Elestor's plans for growth. Kudos to Pantokrator ! https://www.pantokratorltd.com/
Hydrogen-iron flow battery could deliver 25-year grid energy storage with 80% efficiency
Article on Interesting Engineering: A Dutch battery manufacturer has developed a revolutionary hydrogen-iron flow battery that could reportedly power grids for decades while maintaining stable efficiency across tens of thousands of charge-discharge cycles.
Read more
Article and interview in Solar365 magazine: Elestor to build largest hydrogen battery ever
For the energy transition to succeed, sufficient renewable generation is required, but also the ability to store that energy for longer periods. Technologies capable of storing energy between eight and one hundred hours can play a crucial role. A broad consortium has received €22 million in funding from the Dutch National Growth Fund for the so-called SLDBatt project (Sustainable Long Duration Battery), which focuses on long-duration electricity storage.
Read more
With € 30 million, the SLDBatt project in the context of the Growth Fund Material Independence & Circular Batteries is the largest R&D project into battery technology for long-term storage of sustainably generated electricity in the Netherlands
Minister Hermans with SLDBatt consortium representatives at IEA Energy Storage Symposium in Rotterdam (credits: Mathias de Graag / RVO)
Read more