Elestor acquires “FlowBox” assets from Areva
Largest hydrogen bromine flow battery in the world will be completed by Dutch developer
ELESTOR (NL) and AREVA (F) signed the formal agreement for the acquisition of the FlowBox project assets. This project, headed by Areva with the partners InnoEnergy France, EnStorage and Schneider Electronics, developed and built a prototype hydrogen bromine flow battery of 150 kW / 900 kWh. This is the largest hydrogen bromine flow battery in the world.
The transfer is in line with the new strategic action plan of Areva Energy Storage (*). On October 9th, 2018, Areva Energy Storage announced to focus on industrialization of its modular PEM fuel cell technology for which it has already obtained a strong international position.
”We are pleased”, says Michel Loiseau, President of AREVA Energy Storage, “that the flow battery expertise will be preserved for the European industry. To us Elestor is an ideal party to acquire the activities that we have started under FlowBox.”
Wiebrand Kout, CTO of Elestor, comments: “This is world class knowledge and very relevant for us. Although we regret that AREVA Energy Storage and partners had to end their flow battery developments, we are satisfied that we managed to take over a large part of their hardware and expertise. There is large interest in Elestor’s technology worldwide and this agreement gives us the opportunity to further accelerate our developments”.
Early 2019 the system will be moved to the Netherlands, where it will be completed with bi-directional inverters and Elestor’s proprietary membrane stacks to bring it to full operation.
(*) Areva Energy Storage 100% subsidiary of Areva group
Hydrogen-iron flow battery could deliver 25-year grid energy storage with 80% efficiency
Article on Interesting Engineering: A Dutch battery manufacturer has developed a revolutionary hydrogen-iron flow battery that could reportedly power grids for decades while maintaining stable efficiency across tens of thousands of charge-discharge cycles.
Read more
Article and interview in Solar365 magazine: Elestor to build largest hydrogen battery ever
For the energy transition to succeed, sufficient renewable generation is required, but also the ability to store that energy for longer periods. Technologies capable of storing energy between eight and one hundred hours can play a crucial role. A broad consortium has received €22 million in funding from the Dutch National Growth Fund for the so-called SLDBatt project (Sustainable Long Duration Battery), which focuses on long-duration electricity storage.
Read more
With € 30 million, the SLDBatt project in the context of the Growth Fund Material Independence & Circular Batteries is the largest R&D project into battery technology for long-term storage of sustainably generated electricity in the Netherlands
Minister Hermans with SLDBatt consortium representatives at IEA Energy Storage Symposium in Rotterdam (credits: Mathias de Graag / RVO)
Read more